Capacity & lead times

The whole ramp, not just the year-five number.

Any supplier can quote you a capacity headline. The number that matters is what the line can absorb in the year you want to place an order, so here is every year of the plan — and what is installed today, which is nothing.

The question this page answers — can you make my volume, and when?
1

The plan ramp.

Item 1.0
Plan figures
Plan yearBicyclesE-bicyclesLine status
Year 112,000—Single shift, bicycle only
Year 232,000—Two shifts, bicycle only
Year 348,0009,500E-bicycle integration added
Year 465,00020,500Both lines at scale
Year 580,00030,000Full plan capacity

Item 1.1 — how to read these

These are plan figures, not orders held and not capacity installed. Year 1 begins at commissioning, targeted Q2 2027. We would rather publish the ramp and be held to it than publish a headline you cannot buy against.

2

Terms we are specifying the line to meet.

Item 2.0
Commercial
ProgrammeMinimum orderTarget lead timeIncoterm
Bicycle500 units65 dFOB Mundra
E-bicycle300 units75 dFOB Mundra
Pilot run50 units30 dEXW Ludhiana

Item 2.1 — when these become contractual

On your first purchase order, not before. Today they are design targets for a line being specified. If your programme needs a term we have not listed, say so now while the specification is still open — that is the whole point of the offer.

Fig. 01 — Process layout, eight stations Rev A · design intent No line commissioned as of 28 Aug 2026
3

Eight stations, and why not a conveyor.

Item 3.0
AMP-PL-LAY rev A

Station-based rather than a conveyor, deliberately — a conveyor sets one takt for every product and punishes the mixed, short-run work an ODM actually gets asked for. Stations let us run your 500 without stopping somebody else's 5,000. The floor layout is drawn on the factory page.

Send us a drawing and a volume. Costed quotation in five working days.